Anritsu MG369XB Portable Generator User Manual


 
Chapter 2
Installation
2-1 Introduction This chapter provides installation instructions for the series
MG369XB synthesized signal generator. It includes information on ini
-
tial inspection, preparation for use, storage, reshipment, and General
Purpose Interface Bus (GPIB) setup and interconnections.
2-2 Initial Inspection Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, retain until the contents of the ship
-
ment have been checked against the packing list and the signal gener
-
ator has been checked for mechanical and electrical operation.
If the shipment is incomplete or if the signal generator is damaged
mechanically or electrically, notify your local sales representative or
Anritsu Customer Service. If either the shipping container is damaged
or the cushioning material shows signs of stress, notify the carrier as
well as Anritsu. Keep the shipping materials for the carrier's inspec-
tion.
2-3 Preparation For Use Preparation for use consists of installing the instrument into a
suitable operating location and connecting the signal generator to a
power source. The following paragraphs provide these procedures
along with information about power requirements, warmup times, and
the operating environment. Figure 2-1, on the following page,
illustrates the basic outer dimensions of the instrument.
MG369XB OM 2-3