Tektronix AWG510 Portable Generator User Manual


 
Adjustment Procedures
5-2
AWG510 & AWG520 Service Manual
Requirements for Adjustments
Before doing the adjustments, note the following requirements.
This procedure is only to be performed by trained service technicians.
This waveform generator requires a 20 minute warm-up time in a 20_ C to
30_ C environment before it is adjusted. Adjustments done before the operating
temperature has stabilized may cause errors in performance.
The cabinet must be removed and additional cooling fan must be provided when
making the adjustments in this procedure. Refer to Before Adjustments on the
next page for detailed information.
Calibrate the waveform generator using the self calibration routine. Refer to the
subsection, Maintenance, in Section 4, Performance Verification for instructions.
These adjustment proceudres require loading a file from the Performance
Check/Adjustment disk supplied with the waveform generator. Refer to
Adjustment Instruntions in this subsection for information about this file.
Table 5–2 lists all test equipment required to adjust the waveform generator.
Personnel
WarmĆUp Period
Access
Self Calibration
Performance
Check/Adjustments Files
Test Equipment