Exabyte 1X7 LTO Compact Loader User Manual


 
20
PRODUCT MANUAL 1012581
CHAPTER 2—INSTALLING THE AUTOLOADER
6.
6.6.
6. Power on the host computer system.
VERIFYING THE HARDWARE INSTALLATION
After the autoloader powers on, the LCD displays the Home screen. As shown
in the example below, the first line of the Home screen displays the product
name and the second line shows status for the autoloader and tape drive.
If the autoloader powered on as described, continue with configuration in
Chapter 3.
If the autoloader did not power on as described, check the following:
Is the power switch on?
Is the power cord inserted correctly?
Is the SCSI bus terminated?
Are the devices on the SCSI bus attached to the autoloader all LVD?
Is the SCSI cable firmly connected to the autoloader and host computer or
other devices on the bus?
Is the host computer system turned on?
Is there an error message displayed on the autoloader’s LCD? (see
Appendix C for descriptions of LCD error messages.)
For additional tips, see Chapter 8, “Troubleshooting.
!
! !
! Important
Do not power on the host computer system immediately after
powering on the autoloader. After you press the autoloader’s
power switch, there is a short delay before the tape drive is
on-line.
L T O 1x7 2 U
Ultrium 3-S D217