When you insert a loopback connector in to the T port, no green light appears to
indicate a proper insertion. However, the test will run and be valid.
If only one of the links has failed and the I/O is traveling over the remaining link,
I/O is automatically routed over the repaired link by the switch after the failed
link is replaced and recabled. No manual intervention is required.
If both links have failed and a LUN failover has occurred, you must manually run
a failbackt3path command to return the paths to their optimal state, after you
repair and recable the links.
To Isolate the T1 or T2 Data Path
1. Run linktest from the Storage Automated Diagnostic Environment for a guided
isolation procedure.
2. After replacing the failed FRU, run failbackt3path , if needed.