Tektronix MTG100, MTG300 Portable Generator User Manual


 
Performance Verification
MTG100 & MTG300 MPEG Generator Service Manual
4Ć13
7. Double-click the Data Store Administrator icon in the MPEG test system’s
Program Group window to start the application.
8. In the Data Store Administrator window, click the A (acquisition) command
button to open the Acquisition settings window.
9. In the Acquisition settings window, enter the following selections:
Board File test.trp (or unique file name). . .
Partition Single shot (this selection appears if the hard. . . .
drive of the MPEG test system is partitioned)
Size 10,000,000 (bytes). . . . . . . .
Synchronization Lock Psync. . . . . . .
Port Serial ECL. . . . . . . .
MSB First box Check (this selection appears after the port is
set to Serial ECL)
10. In the Acquisition settings window, click Start to start the acquisition.
11. Click OK after the “Transfer is finished” message appears.
12. Select Exit/Quit from File menu or click the close box in the upper-right
corner of the application window to exit the Data Store Administrator
application.
13. Double-click the Deferred Time Analyzer icon in the MPEG test system’s
Program Group window to start the application.
14. In the Deferred Time Analyzer window, select Open from the File menu or
click the Open command button in the upper toolbar to open the Open
dialog box.
15. Select the C:\Carb0\mono\test.trp (or your unique file name) file in the
Open dialog box, and then click Open to open the test.trp file.
16. In the Deferred Time Analyzer window, select Consistency Check from the
Analysis menu to check for consistency within the stream file.
17. Verify that the No Error Found dialog box appears after the stream file is
checked by the Deferred Time Analyzer application.
18. Press the START/STOP button on the MPEG generator to stop the signal
output, and then remove the parallel interface cable from the rear panel.