6 - 4
MELSEC-Q
6. PROJECT CREATION
HELPFUL OPERATION (PART 2)
When utilizing the data written to the QD75 to create a new project, perform the
following operation.
1. Set the QD75 type, project save path, project name and project title in the New
Project dialog box.
2. Click the "New Project read from unit" check box.
3. Click the "OK" button.
4. Click the "OK" button in the instruction dialog box.
5. Set the interface, I/O address and others in the Connection setup dialog box
(refer to Section 7.1).
6. Click the "OK" button.
7. Set the type and range of the data to be read in the QD75 Reading dialog box
(refer to Section 9.1).
8. Click the "OK" button to read the positioning data, block start data and
parameters in the specified range from the QD75.
<New QD75 reading procedure>
New project creation
Instruction is given to indicate
which QD75 model has precedence.
Connection setup (refer to Section 7.1)
Read from QD75 (refer to Section 9.1)
• When new project read from unit is performed for new project creation, the QD75
connected has precedence if the QD75 model of the project differs from the QD75
model connected.
After completion of reading, choose the [Project]
[Change QD75 model] menu
to change the model. (Refer to Section 11.1.2.)