Mitsubishi Electronics SW0D5C-QD75P-E Weather Radio User Manual


 
10 - 26
MELSEC-Q
10. POSITIONING DEBUGGING
10.4.3 Speed change test
PURPOSE
Make a speed and/or acceleration/deceleration time change to the axis operating
in the positioning start, OPR or JOG operation test to check the adequate speed
and/or acceleration/deceleration time.
BASIC OPERATION
1. Place the QD75 in the test mode in accordance with Section 10.4 (1).
2. Click the [Online]
[Test] [Operation test] [Operation test #1 to #4] menu (
to
).
3. Perform positioning start test (refer to Section 10.4.1), OPR test (refer to Section
10.4.4) or JOG/MPG operation test (refer to Section 10.4.5) in the TEST MODE
setting dialog box.
4. Click the <<Speed CHG>> tab in the TEST MODE setting dialog box.
5. When changing the acceleration/deceleration time, click the unchecked
"ACC/DEC time set enable" check box and set the acceleration/deceleration
time.
6. Make a speed change test on the running axis.
7. To exit, click the "Close" button.
DISPLAY/SETTING SCREEN