PSC PT Program Generator Portable Generator User Manual


 
Getting Started
12 PT Program Generator (PPG) v5.0
Program Nodes Toolbar
To create new PPG Program Nodes, click on the node’s Create button:
For a complete description of each node type, refer to
Creating & Using Nodes on
page 49.
Copy
Copy the selected node to the clipboard.
Refer to Copy (Ctrl+C) on page 35.
Paste
Paste the cut or copied node to the flow chart.
Refer to Paste (Ctrl + V) on page 35
.
Print
Open the Print dialog box.
Refer to Printing a File (Ctrl+P) on page 26.)
Help
Open the PPG online Help file.
Refer to PPG Help (F1) on page 47
.
Click this Button To
Frame Create a new
Frame. (Refer to Frames on page 50.)
Subroutine Create a new
Subroutine. (Refer to Subroutines on page 51.)
Menu
Create a new
Menu node. (Refer to Menu Nodes on page 55.)
Display Create a new
Display node. (Refer to Display Nodes on page 56.)
Input Create a new
Input node. (Refer to Input Nodes on page 57.)
Output
Create a new
Output node. (Refer to Output Nodes on page 60)
Verify
Create a new
Verify node. (Refer to Verify Nodes on page 63.)
Copy
Create a new
Copy node. (Refer to Copy Nodes on page 66.)
Modify
Create a new Modify node. (Refer to Modify Nodes on page 67.)
Math
Create a new
Math node. (Refer to Math Nodes on page 69.)
Call Create a new
Call node. (Refer to Call Nodes on page 72.)
Link Create a new
Link. (Refer to Links on page 73.)
Click this Button To
2342.book Page 12 Thursday, July 22, 2004 8:35 AM