Buhler 2425 Lawn Mower User Manual


 
SECTION 3 - LUBRICATION AND MAINTENANCE
3-28
EVERY 50 HOURS
OPERATION 21
Check the Engine Air Cleaner Connections
The air i nduction system pipe work must be
checked for proper sealing.
On the 2360 and 2425 (N14), check to be sure
that the hose clamps, attaching the pipe work
between the turbocharger and air c leaner are
tight and that no air can enter the air induction
system without first passing through the air
cleaner. (N14 engine shown in illustration)
On the 2290, 2335 and 2375 (QSM11), check the
hose clamps, on the pipe work between the air
cleaner and turbocharger. Make sure theclamps
are tight and no air can enter the engine air
induction system without first passing through
the air cleaner.
Figure 3-36
1