Workman MD/MDX Drive TrainPage 5 -- 47
1. Governor shaft (Workman MD) 2. Bolt
Figure 75
15 to 18 ft--lb
(21to25N--m)
1
2
NOTE: When installing case (RH) to the case (LH) on
Workman MD, hold governor shaft so the ball bearing
will not drop off. Keep the gasket sealing surfaces of the
cases as horizontal to each other as possible. If the seal-
ing surfaces do not join to each other,tap the case lightly
with a plastic hammer.
C. Install case (RH) so each shaft fits properly into
the case.
D. Secure case (RH) to case (LH) with bolts. Torque
bolts from 15 to 18 ft--lb (21 to 25 N--m).
1. Axle bracket 2. Flange bolt
Figure 76
25 to 31 ft--lb
(34to42N--m)
1
2
E. Position axle bracket to each axle case. Secure
axle bracket to each axle case with flange bolts.
Torque bolts from 25 to 31 ft--lb (34 to 42 N--m).
Drive Train