Agilent Technologies E8247C PSG CW Portable Generator User Manual


 
Chapter 3 65
Optimizing Performance
Creating and Applying User Flatness Correction
Configure the Power Meter
1. Select SCPI as the remote language for the power meter.
2. Zero and calibrate the power sensor to the power meter.
3. Enter the appropriate power sensor calibration factors into the power meter as appropriate.
4. Enable the power meter’s cal factor array.
NOTE For operating information on a particular power meter/sensor, refer to its operating guide.
Connect the Equipment
Connect the equipment as shown in Figure 3-4.
NOTE During the process of creating the user flatness correction array, the power meter is slaved
to the signal generator via GPIB. No other controllers are allowed on the GPIB interface.
Figure 3-4 User Flatness Correction Equipment Setup