A SERVICE OF

logo

106 Wavelink Avalanche Enabler Configuration
VX5 Reference Guide E-EQ-VX5RG-G-ARC
Startup/Shutdown
Figure 3-15 Startup / Shutdown Options
Do not monitor or launch utility When the device boots, do not launch the Enabler
application and do not attempt to connect to the Mobile
Device Server.
Monitor for updates Attempt to connect to the Mobile Device Server and
process any updates that are available. Do not launch
the Enabler application.
Monitor and launch update utility Attempt to connect to the Mobile Device Server and
process any updates that are available. Launch the
Enabler application.
Program Shutdown (Continue or
Stop monitoring)
The system administrator can control whether the
Enabler continues to monitor the Mobile Device Server
for updates once the Enabler application is exited.