When the "Occurs" selection is made, the "Else on" resource term (secondary
branch) becomes available for a second branching option. If the first
resource term (primary branch) is not found, and the second resource term
is found, the analyzer branches to the sequence level designated in the
Branching field.
Sequence Level Instruction
The Trigger Menu
Sequence Instruction Menu
5–15