Trane BCXC-SVX01B-EN Blower User Manual


 
46 BCXC-SVX01B-EN
Pre-Start
Pre-Start Checklist
Complete this checklist after installing the unit to verify all recommended installation procedures
are complete before unit startup. This does not replace the detailed instructions in the appropriate
sections of this manual. Disconnect electrical power before performing this checklist. Always read
the entire section carefully to become familiar with the procedures.
ƽ WARNING
Hazardous Voltage!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power can not be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
Receiving
Inspect unit and components for shipping damage. File damage claims immediately with the
delivering carrier.
Check unit for missing material. Look for ship-with drives, isolators, filters, and sensors that are
packaged separately and placed inside the main control panel, fan section, or compressor section
(see “Receiving and Handling,” p. 11).
Check nameplate unit data so that it matches the sales order requirements.
Unit Location
Remove crating from the unit. Do not remove the shipping skid until the unit is set in its final
position.
Ensure the unit location is adequate for unit dimensions, ductwork, piping, and electrical
connections.
Ensure access and maintenance clearances around the unit are adequate. Allow space at the end
of the unit for shaft removal and servicing (see “Service Access,” p. 12).
Unit Mounting
Place unit in its final location.
Remove shipping skid bolts and skid.
If using isolators, properly mount unit according to the isolator placement sheet.