Toro 3010 Lawn Aerator User Manual


 
Figure 4
O-Ring
SAE Straight Thread O-Ring Port - Non-adjustable
(Fig. 4)
1. Make sure both threads and sealing surfaces are free
of burrs, nicks, scratches, or any foreign material.
2. Always replace the O-ring seal when this type of fitting
shows signs of leakage.
3. Lubricate the O-ring with a light coating of oil.
4. Install the fitting into the port and tighten it down full
length until finger tight.
5. Tighten the fitting to the correct flats from finger tight
(F.F.F.T.).
Size F.F.F.T.
4 (1/4 in. nominal hose or tubing) 1.00 r .25
6 (3/8 in.) 1.50 r .25
8 (1/2 in.) 1.50 r .25
10 (5/8 in.) 1.50 r .25
12 (3/4 in.) 1.50 r .25
16 (1 in.) 1.50 r .25
SAE Straight Thread O-Ring Port - Adjustable
(Fig. 5, 6)
1. Make sure both threads and sealing surfaces are free
of burrs, nicks, scratches, or any foreign material.
2. Always replace the O-ring seal when this type of fitting
shows signs of leakage.
3. Lubricate the O-ring with a light coating of oil.
4. Turn back the jam nut as far as possible. Make sure
the back up washer is not loose and is pushed up as far
as possible (Step 1).
Lock Nut
O-Ring
Back-Up Washer
5. Install the fitting into the port and tighten finger tight
Figure 5
until the washer contacts the face of the port (Step 2).
6. To put the fitting in the desired position, unscrew it by
the required amount, but no more than one full turn
Step 1
(Step 3).
7. Hold the fitting in the desired position with a wrench
and turn the jam nut with another wrench to the correct
flats from finger tight (F.F.F.T.) (Step 4)
Size F.F.F.T.
Step 2
4 (1/4 in. nominal hose or tubing) 1.00 r .25
6 (3/8 in.) 1.50 r .25
8 (1/2 in.) 1.50 r .25
10 (5/8 in.) 1.50 r .25
Figure 6
12 (3/4 in.) 1.50 r .25
16 (1 in.) 1.50 r .25
Step 3
Step 4
General Information Page 4 - 4 Hydroject 3010