Operating Instructions
153 146 167
C 9.92
Maintenance during the initial period
of operation
The following services and inspections are due during the
initial period of operation:
Maintenance after the first 50 service hours
Maintenance after the first 500 service hours
Maintenance after the first 50 service
hours
Checking the engine for leaks
- Raise the dumping subframe (dump body*) and
secure it against accidental lowering.
- Check the engine and attachments for leaks.
Checking air tubes and air hoses for leaks
- Check the air tubes and air hoses (1) for damage and
leaks.
Bild_S 990_033
1
* Option