Holder C 9.92 H Lawn Mower User Manual


 
Operating Instructions
153 146 115
C 9.92
Operating the attachments
Connecting line for priority flow valves 1 and 2
The oil flow of priority flow valves 1 and 2 can be combined
with the connecting line. This will result in a flow rate of 0 to
50 litres/min.
- Set the changeover lever (1) in the area of the articu-
lated joint to the up position.
The priority flow valves 1 and 2 are now connected.
- Set the rotary knob for priority flow valve 2 to the
max. position. You can set the desired flow rate with
the rotary knob for priority flow valve 1.
ATTENTION
If the flow rate selected is higher than intended
for the attachment, the attachment can be
damaged or people standing in the vicinity
can be injured.
- Set the changeover lever (1) to the rear position.
The priority flow valves 1 and 2 are now separated.
1
Bild_S 990_030