A-Boom (JD 6615 / 7615 Asy Instruction Manual) 07/03
© 2003 Alamo Group Inc.
Section 8 - 2
Cylinder Control Valve Installation
1. The controller assemblies will be bolted
together using a tie rod bolt. The control
handles are the same and the cables are the
same, it is where they are connected to the
control valve that makes a difference. (See
Figure 1).
2. The "ON" / "OFF" Switch is bolted to the
Control Handles. This is a good place but can
be mounted somewhere else is desired. If
Mounted somewhere else keep in mind it
must be accessible quickly by the operator in
case of emergency needs. (See Figure 1)
3. The Arm Rest is bolted to the Control
Handles. This has some options as to where
it is bolted and can be bent to adjust to
individual preference. (See Figure 2).
4. Control Handle Stand is bolted to the
floor of the Cab under the Floor Mat on the
right hand side. There is a rubber plug in floor
under floor mat here. remove and/or cut the
rubber plug to run the cables and wire har-
ness through it. The opening around cables
through rubber plug can be sealed using
silicone sealer. Floor mat will lay back down
aroung cables and leave a small area of floor
mat opening. (See Figure 3)
5. Control Cables to Valve The control
cables will connect to Valve as shown in
figure 3, To ID which cable is which have one
person move handle inside and mark which
cable moves outside. The cable connection
procedure is shown. (See Figures 4 through
14).
Swing
Lift
Dipper
Extend
Tilt
"ON" "OFF"
Switch
Figure 1
Control Handle Assembly Installation :
Figure 2
Figure 3