AOC 15 Portable Generator User Manual


 
4.0 Planning and Installation Checklist
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer
on page v of this document.
DOC012R02 AOC 15/50 User Manual Nov 2001
28
Platform or bucket for blade installation
Appropriate safety equipment
Crane
Forklift or boom truck
4.8 Installation Personnel Considerations
The installation and maintenance of a wind turbine requires specialized skills, equipment and
experience. AOC assumes that all installation and operation personnel will have these skills,
experience and equipment. Only trained and qualified technicians should attempt to climb a
wind turbine tower and should use OSHA/ANSI approved practice and equipment. It is highly
recommended that a trained AOC representative be present for the erection and assembly of the
wind turbine (see Section 4.9). The following personnel should also be present, as and when
required, during installation:
One to two qualified technicians trained in climbing safety to erect and install wind
turbine
Qualified crane operator to operate the crane during tower and wind turbine lifting
Certified electrician and/or utility personnel to install cables and wire controllers
Additional labor for non-technical tasks such as tower assembly
4.9 General Installation/Commissioning Timeline
The following timeline represents the minimum installation schedule for one wind turbine under
ideal circumstances. Three to five days is usually a reasonable estimate. Poor weather
conditions, logistic problems and poor planning may extend the timeline considerably.
Site Preparations and Construction:
Pour foundation
Create cableways, wiring, power cables
Install and wire control boxes, capacitor, and dynamic brakes
Inspect wind turbine and hardware