4.0 Planning and Installation Checklist
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer
on page v of this document.
DOC012R02 AOC 15/50 User Manual Nov 2001
26
The following list contains suggested documentation to prepare in advance and have on hand to
ensure efficient and proper site development, as well as for submittal for the necessary
approvals:
• Plot plan
• Site layout
• Tower foundation drawing
• Tower assembly drawing
• Site wiring layout
• Control house interior wiring (if applicable) diagram
• Control house physical layout (if applicable)
• Utility interface - single line drawing
• Utility interface - three line drawing
• Wind turbine generator to control box wiring schematic
• Wind turbine generator wiring diagram
4.5 Construction Planning Considerations
To reduce delays later and to minimize cost, the following items should be considered during
the planning process:
• Subcontractor roles and responsibilities
• Cable trenches (type, length and depth)
• Control enclosure design
• Site specific weather extremes
• Tower foundation type
• Foundation forming details
• Site accessibility and road conditions
• Crane availability and cost
• Concrete availability and cost
• Backhoe availability and cost
• Concrete reinforcing bar availability and cost
• Labor skills and related costs
• Soil characteristics
§ Soil stability
§ Depth to water table
§ Depth to significant frost
§ Allowable bearing capacities
• Blasting needs
• Tripod or backhoe for tower assembly
• Availability of hand tools
• Concrete working tools
• Anchor bolt template and verification of proper placement
• Fencing materials and security