Appendix K-1 Procurement Responsibilities
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this
document.
DOC012R02 AOC 15/50 User Manual Nov 2001
173
PROCUREMENT RESPONSIBILITY
GENERAL DESCRIPTION
AOC
PROVIDES
CUSTOMER
PROVIDES
Wind Turbine Drivetrain
X
Gearbox
X
Generator
X
Parking Brake
X
Assembly Hardware
X
Blades (unassembled)
X
Tip Brakes
X
Tip Brake Cables
X
Assembly Hardware
X
Standard 80 ft Tower
X
Tower Safety Climbing Cable and harness
X
Foundation (engineering, materials, labor)
X
Anchor Bolts, Nuts and Template (standard foundation)
X
Weatherproof Controls Structure (If using non-NEMA 4 Enclosures)
X
Controls, Power Electronics and Enclosure (non-NEMA 4)(NEMA 4/tropical
optional)
X
Power Factor Correction
X
Grid Monitor
X
Surge Protector
X
PLC/Controls and Enclosure
X
Dynamic Brake Capacitors and Enclosure
X
Dynamic Brake Resistors and Enclosure
X
Generator Resistor Contactor Soft Start (optional)
X
Throw Switch
X
125 A, 3 Phase Circuit Breaker
X
75 KVA Transformer
X
Watts Transducer and Current Transformer (optional)
X
Parking Brake Heater
X
Transmission Heater
X
KWH Metering Device
X
Tower Base Pull Box (optional)
X
Twist Cable Jct Box
X
Control Cable (b/w generator jct box and twist cable jct box)
X
Power Cable (b/w generator jct box and twist cable jct box)
X
Anemometer Cable (b/w generator jct box and twist cable jct box)
X
Anemometer Cable (b/w twist cable jct box and controls and utility)
X
Control Cable (b/w twist cable jct box and controls and utility)
X
Power Cable (b/w twist cable jct box and controls and utility)
X
All Protective Conduit (b/w twist cable jct box and controls and utility)
X
Spare Parts
X
NOTE: This procurement checklist is a tool for planning purposes only and is by no means a
substitute for contractual agreements. Some items may or may not have been purchased by the
customer.