MAINTENANCE
Saber Maintenance Section 4-15
©2011 Alamo Group Inc.
MAINTENANCE
GREASING POINTS ON BOOM AND PIVOT
Locate grease zerks (8) on deck pivot assembly, (2)
on the deck end of secondary boom, (2) at main/
secondary boom joint, and (2) at swivel end of main
boom. Inject Lithium-Complex Extreme Pressure
grease conforming to NLGI2-ISO 320 specifications
until grease begins to protrude from ends.
BOOM / CHEETAH
SABER