Lincoln Electric SVM208-A Portable Generator User Manual


 
THROTTLE
LOCKING
NUT
FIGURE F.8 – LOCKING NUT LOCATION
HIGH SPEED
STOP SCREW
FIGURE F.9 – STOP SCREW LOCATION
ENGINE THROTTLE ADJUSTMENT TEST
ROBIN/SUBARU ENGINE (continued)
2. Using the 10mm socket wrench, slightly loosen
the throttle locking nut. See Figure F.8.
3. Using the screwdriver, adjust the high speed
stop screw until the waveform period is 16.2
milliseconds. See Figure F.9.
4. Re-tighten the throttle locking nut. See Figure
F.8.
TROUBLESHOOTING AND REPAIR
F-27 F-27
BULLDOG® 140
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC