Black Box Outlet Managed PDU Multi-tool User Manual


 
OUTLET MANAGED PDU
138
When the "Conrm Plug Actions" button is pressed, the Outlet Managed PDU
will display a screen which lists the selected action(s) and asks for conrmation
before proceeding. To implement the selected action(s), click on the "Execute Plug
Actions" button. The Outlet Managed PDU will display a screen which indicates
that a switching operation is in progress, then display the Plug Status screen when
the command is complete. At that time, the Status Screen will list the updated On/
Off status of each plug.
Notes:
• When switching and reboot operations are initiated, Boot/
Sequence Delay times will be applied as described in Section 5.7.
• If a switching or reboot command is directed to a plug that
is already in the process of being switched or rebooted by a
previous command, then the new command will be placed in a
queue until the plug is ready to receive additional commands.
• If the Status column in the Plug Control Screen includes an
asterisk, this means that the corresponding outlet is busy
completing a previously invoked command.
• When the Plug Control Screen is displayed by an account that
permits Administrator or SuperUser level commands, all switched
outlets will be displayed.
• When the Plug Control Screen is displayed by a User level
account, the screen will only include the switched outlets that are
allowed by the account.