Agilent Technologies HP8648A Weather Radio User Manual


 
Preparing the Test Set for DC Operation
246
Preparing the Test Set for Operation
1. Verify that the instrument is connected and configured to the appropriate
power source.
NOTE: Because most parameters are saved when power is removed, setting
configuration is NOT necessary every time power is applied to the Test Set.
Perform these procedures only if changes to the fields are required.
2. Turn the Test Set POWER ON (in). After approximately 15 seconds, verify
that the CRT screen displays “All self tests passed” and that the “RX
TEST” screen is displayed.
3. Press the CONFIG key to display the CONFIGURE screen.
cnfgscrn.wmf