Husqvarna Pro 18 AWD Lawn Mower User Manual


 
22 – English
Page
25
50 100 300
Maintenance
Maintenance Schedule
The following is a list of maintenance procedures that must be performed on the rider. For points marked
with footnote number 4, turn to an authorised service representative.
= Described in this operator’s manual. = Not described in this operator’s manual.
Daily main-
tenance
before after
MAINTENANCE
Maintenance
interval hours
Weekly
3)
main-
tenance
At least
once
a year
Check for fuel and oil leaks -
Check the parking brake 15
Check the engine’s oil level (every refuelling) 59
Check the fuel pump’s air filter 28 ●●
Check the safety switch, seat 33
Check the safety switch, lifting lever 33
Check the safety switch, pedal system 33
Check/clean the engine’s cooling air intake. 31 ●●
Check the cutting unit: 45
• mounting of blades 51
• condition of the blades (sharpness, shape, etc) 51
Check the steering cables (any play, etc.) 25
Check fastenings (screws, nuts, etc.) -
Start the engine and blades,
listen for abnormal sounds -
Clean under the cutting unit 48
Clean the transmission’s cooling air intake 28 ●●
Inspecting the muffler 27
Check the battery’s acid level 31
Check the transmission oil level 61
Check the condition of belts, belt pulleys, etc. -
Check for damage -
Check the tyre pressures (60 kPa / 9 PSI) 35
Check to ensure that the cable holder
in the middle is undamaged -
Clean thoroughly around the engine 31
Clean carefully around the muffler 31
Clean thoroughly around the transmission (s) 28
Clean around all belts, belt pulleys, etc. -
Lubricate the belt tensioner (nipple) 59
Lubricate the three-point link 58
Lubricate the driver seat 58
Lubricate all cables 56
Lubricate links in the cutting unit 56
Clean the frame tunnel -
Lubricate the pedal mechanism
in the frame tunnel 57
Lubricate the hydrostatic cable with linkage 60
Lubricate the parking brake cable 61+63
Lubricate the throttle 58
Lubricate the choke control 58
Lubricate the guide chain in the frame tunnel 57
Check the steering cables in the frame tunnel 25