Dimension One Spas 2000 Model Hot Tub User Manual


 
24
2000 Owner’s Manual
1) Before filling your spa, install the black plastic hose bib that is
included in the owner’s manual packet located in the equipment
compartment. Screw it onto the male fitting at the bottom of the
spa on the pedestal, to the lower left of the equipment compartment.
Close the valve and screw the cap onto the end of the bib.
2) Check the pump unions to be sure that they are tight to prevent the
possibility of leakage in the equipment compartment. Also, open
both bleeder valves located in the skimmer area.
3) Fill your spa with water to a level of one to two inches above the
bottom of the tile line.
4) Remove the two shipping bolts located on the front of the pump
mount and ensure that the gate valves on the pump are in the open
position (handles fully extended).
5) Turn on the circuit breaker. Dashed lines will appear in the LCD for
30 seconds. After this 30 second diagnostic check, the ozone genera-
tor and circulation pump will come on.
6) Push the JETS 1 and 2 pad to turn both pumps onto high speed. Let
the system run for 30 to 45 seconds to prime the pumps. If there is
no jet action, then the water level is too low or there is air trapped in
the plumbing lines. To eliminate the trapped air, turn the pumps on
and off several times to force the trapped air through the pumps. If
there is still no jet action, and the bleeder valves have been open for
some time, turn off the pumps and loosen the top pump unions
slightly to let any trapped air escape. Re-tighten the pump unions
and turn the pumps on again. Turn the pumps on and off several
times until jets function properly.
NOTE: Bubbles will continue to release from the skimmer recess Ultra
Pure bleeder valve as long as the valve remains open. This is a normal
function.
INITIAL ST ART-UP FOR THE
CHAIRMAN II, DIPLOMA T, CHAIR -
MAN, CALIFORNIAN, NA UTILUS,
TRIAD II AND A URORA II