Telect MDC-CB Outdoor Storage User Manual


 
Telect, Inc. • USA +1.509.926.6000 • Mexico +1.52.33.3836.3700
Poland +1.48.713.239.100 • UK +1.44.1489.889500 • www.telect.com
Copyright © 2002 Telect, Inc., All Rights Reserved
Page 3-8
10. At front of cabinet, secure patch module swing-out door.
11. Repeat Steps 4 through 10 for the next Patch Module and distribution cable.
12. Continue so until all scheduled Patch Modules are installed.
13. Re-insert cable entrance dock: tilt it up as shown in the following illustration, and then slip the feeder and distribution cable
clamps into the slots. Use extra clamps to fill out the slots containing only one cable.
14. Pivot the dock to the floor of the cabinet and re-install the chock bar. Push the chock bar against the cable clamps and secure.
15. Close the rear door.
Thumbscrew for securing Patch Module Door
Finishing Cable Installation