John Deere OMPFP11362 Lawn Mower User Manual


 
Machine and Implement Setup
JS56696,00009D2 1919MAY111/1
Client, Farm, Field, and Task Setup
This is a required step for boundaries to run survey mode
or to record ditch and levee tracks.
Select MENU softkey >> GREENSTAR 3 PRO softkey >>
RESOURCES/CONDITIONS softkey >> RESOURCES
tab.
The documentation screen allows the setup of operations
and specific details associated with those operations.
IMPORTANT: When setting up the display with
vehicle key in the accessory position (power
on, engine off), turn key to OFF position for
20 seconds BEFORE starting the vehicle.
This ensures the setup data is saved to the
USB flash drive before operating.
If the vehicle is running during setup and
programming, turn off the vehicle with key
in the OFF position and wait 30 seconds
before restarting. This ensures all data is
saved to the USB flash drive.
DO NOT turn the key to the start position directly
from the accessory position. The reduction
in voltage during the starting phase could
result in a loss of all setup data.
Choose the correct information from CLIENT, FARM,
FIELD, and TASK dropdown box or input new information.
Task is required only if Documentation is used. It is not
needed to set or AutoTrac ditch or levee tracks. Always
setting tasks is a good standard practice though.
PC8663 —UN—05AUG05
MENU softkey
PC12685 —UN—14JUL10
GREENSTAR 3 PRO softkey
PC8676 —UN—05AUG05
RESOURCES/CONDITIONS softkey
PC10857BV —UN—15JUL08
Resources tab
152
061611
PN=10