DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-293CARR-POW (Carrier Port Power Unit) for DC-Powered Systems
10
1130 ABORT Only occurs when recycling carrier 2B. Indicates
that the Active Expansion Interface Link for the
EPN is in carrier 2B.
1. Issue the set expansion-link A01 command.
2. Rerun the test.
2000 ABORT Response to the test request was not received
within the allowable time period.
2029 ABORT Internal System Error.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the
problem.
1 (Carrier E)
2 (Carrier D)
4 (Carrier A)
8 (Carrier B)
16 (Carrier C)
FAIL There is a problem with one or both port carrier
power units on the recycled carrier.
1. Since the Power Unit Recycle Test failed, both
port carrier power supplies in the recycled
carrier should have been powered off by the
system software. Both port carrier power units
should be showing a red status LED, instead
of a green one. Since the Power Unit Query
Test is a subset of the Power Unit Recycle
Test, the Power Unit Query Test (#127) should
also fail. Run the Power Unit Query Test by
using the test environment P command
where P is the appropriate port network
number.
2. If the test fails, follow the repair procedures
described for Test #127. If the problem
persists, follow normal escalation procedures.
Table 10-84. TEST #126 Power Unit Recycle Test — Continued
Error Code
Test
Result Description/ Recommendation
Continued on next page