Xantrex Technology Link 1000 Portable Generator User Manual


 
Installing the Link 1000
17
Installing Fuses
To install fuses:
1. Install a 2 amp fuse in the fuse holder in the blue wire.
2. If you are using a starting battery, insert a 2 amp fuse in
the fuse holder in the violet wire.
3. Install a 2 amp fuse in the fuse holder in the red wire. The
fuse should be connected in a smooth motion. A
“ragged” power up may cause the Link 1000 to lock up.
The
BATTERY STATUS LEDs and the Numeric Display
come on. The
AC IN LED comes on if AC power is being
supplied to the inverter.
Connecting the Phone Cable
Plug the phone cable into the jack on the display panel
and the jack on the inverter/charger, and then clip the
display panel into the mounting plate.
Testing the Installation
After installing the Link 1000, test its operation.
To verify that the shunt leads are connected correctly:
1. Select Amps as the display unit by pressing
SEL until the
Amps LED comes on.
2. Make a note of the Amps reading.
CAUTION
Install the fuses in the sequence listed below to
prevent damage to the Link 1000.
CAUTION
Make sure you have made all DC power and shunt
connections before connecting the phone cable to
the inverter/charger.