Xantrex Technology Link 1000 Portable Generator User Manual


 
Installing the Link 1000
11
Installing the Link 1000
Overview of Installation Steps
Complete the installation in this order. Refer to Figure 2.
1. Mount the control panel (page 13).
2. Mount the shunt, and cable it to the negative battery
terminal. Cable the load side of the shunt to the negative
bus for DC loads (page 14).
3. Connect wires to the Link 1000 terminal block (page 15).
4. Connect wires from the terminal block to the shunt and to
the battery’s positive terminal (page 16).
5. Install the fuses (page 17).
6. Connect the phone cable to the control panel and the
inverter/charger (page 17).