Woods Equipment S30CD Chipper User Manual


 
Assembly 45
MAN0943 (07/12/2011)
Install Hose Clamps
1. Place hose clamps (36) around hoses (11) and
center hoses between center plate.
2. Mark clamp holes in desired location on shedder
body and drill two 11/32" holes.
3. Secure hose clamps to shredder using 5/16 NF x
1-1/4 cap screws (20), flat washers (33), lock
washers (34) and hex nuts (35). See Figure 56.
Figure 56. Hose Clamp Installation
Connect Hoses to Tractor
NOTICE
Oil flow to hydraulic motor must not exceed 28
gpm.
1. Connect PRESSURE hose to a tractor rear remote
quick coupler that has a lever (handle) that can be
placed in the detent or locked position.
2. RETURN hose must be connected directly to the
tractor reservoir or to a specifically designated
motor return or ‘zero’ back pressure port.
Install Decals
Apply safety decals (24 & 25) to a clean surface on the
back of the shredder where they can be seen without
obstructions. Install decals (25) on either side of the
hose assembly. See Figure 56.
Remove Deflector Kit
1022652 deflector kit must be removed from the shred-
der before using cutter kit. Deflector kit pushes material
away from the cutter kit and preventing material from
being cut.