22 Operation
MAN0943 (07/12/2011)
Figure 15. Transport Position
2. Set shredder back on all four wheels using 3-point.
Raise all shredder lift cylinders to maximum lift
height. Flip transport locks into transport position
(see Figure 16). Lower cylinders into transport
lock. Make sure all four cylinders have bottomed
out.
Figure 16. Transport Lock
3. Unhook hydraulic hoses, PTO shaft, and 3-point
hitch. Secure hoses and PTO shaft for end
transport.
4. Move tractor from operating position to end tow
position. Hook hitch to drawbar.
Figure 17. End Tow - Drawbar
5. An end tow hitch is also available as optional
equipment for hooking shredder to quick hitch.
Figure 18. End Tow - Quick Hitch
6. Slide light bar out to match the widest width of
shredder and pin into position. Attach light harness
to tractor outlet.
Figure 19. Light Bar
■ Do not exceed 20 MPH while transporting
shredder.
STORAGE
Block equipment securely for storage.
Keep children and bystanders away from stor-
age area.
At the end of the season, the shredder should be thor-
oughly inspected and prepared for storage. Repair or
replace any worn or damage components to prevent
unnecessary down time at the beginning of the next
season.
To ensure a long, trouble-free life, prepare the unit for
storage by carrying out the following procedure:
1. Clear the area of bystanders, especially children.
2. Thoroughly wash the unit, using a pressure washer
to remove all dirt, mud, debris, and residue. See
Cleaning instructions on page 21.
DP102
DP101
DP104
DP118
Light Bar
DP125