Woods Equipment S30CD Chipper User Manual


 
42 Assembly
MAN0943 (07/12/2011)
END TOW HITCH INSTALLATION
1. Attach lower end tow hitch mount (4) using
carriage bolts (26), and lock nuts (25).
2. Attach tongue lockup bracket (3) using carriage
bolts (26), and locknuts (25).
3. Bolt hitch (1) to tow hitch mount brackets (33)
using cap screws (27) and locknuts (28).
4. Attach hose bracket (13) to shredder using
carriage bolts (26), flat washer (14) and locknuts
(25).
5. Secure tongue (1) to tow hitch mount (4) using cap
screws (27) and locknuts (28).
6. Install safety chain.
7. Store tongue (1) and wire harness as shown,
Figure 49.
Figure 50. End Tow Hitch Installation
OPTIONAL EQUIPMENT
INSTALL CENTER DEFLECTOR
Slide deflector (1) between shredder center channel
with the point forward.
Secure into position using four 1/2 NC x 1-1/4 carriage
bolts (2) and flange lock nuts (3).
Figure 51. Center Deflector Installed
CENTER CUT KIT INSTALLATION
Block Shredded
Never go underneath equipment (lowered to the
ground or raised) unless it is properly blocked and
secured. Never place any part of the body under-
neath equipment or between moveable parts even
when the engine has been turned off. Hydraulic
system leak down, hydraulic system failures,
mechanical failures, or movement of control levers
can cause equipment to drop or rotate unexpect-
edly and cause severe injury or death. Follow Oper-
ator's Manual instructions for working underneath
and blocking requirements or have work done by a
qualified dealer.
To minimize the potential hazards of working under-
neath the shredder, follow these procedures.
1. Jackstands with a load rating of 2000 lbs or more
are the only approved blocking device for this
shredder. Install a minimum of four jackstands
under the shredder before working underneath
unit.
1. Tongue
3. Tongue Lock Up
13. Hose Bracket
14. 1/2 Flat Washer
15. 3/4 Hitch Pin
25. 1/2 NC Flanged Lock Nut
26. 1/2 NC x 1-1/2 Carriage Bolt
27. 5/8 NC x 9 HHCS
28. 5/8 NC Flanged Lock Nut
33. Lower End Transport Mount
35. Pin
1
2
3
DP3
1. Center deflector
2. 1/2 NC x 1-1/4 carriage bolt
3. 1/2 NC Flange lock nut