Agilent Technologies 75000 Series C Portable Generator User Manual


 
Inspection/
Shipping
This section describes initial (incoming) inspection and shipping guidelines
for the AFG.
Initial
Inspection
Use the steps in Figure 1-2 as guidelines to perform initial inspection of
the AFG.
WARNING
To avoid possible hazardous electrical shock, do not perform
electrical tests if there are signs of shipping damage to the
shipping container or to the instrument.
Figure 1-2. Initial (Incoming) Inspection Guidelines
12 General Information Agilent E1445A Service Manual