Tiger JD 62-6420 Lawn Mower User Manual


 
Assembly Section 2-15
ASSEMBLY
03-01-05
DANFOSS LOAD SENSE LINE INSTALLATION
The load sense line will be plumbed into the side of the tractor remote valve (shown
in the picture on the last page). Locate the plug on the spacer for the load sense, and
remove the plug. Install a 14mm elbow and then connect the 1/4” hose from the
spacer to the Tiger valve. Refer to the Parts Section pages for an exploded diagram of
the tractor remote valve hookup.
HUSCO LOAD SENSE LINE INSTALLATION
To install the load sense line from a Husco valve to the tractor remote valve, first
locate the load sense port located on the bottom of the spacer. Remove the plug and
install 14mm elbow, then attach the 1/4” hose to the end cap and to the top front port on
the Husco valve.
For more information refer to the Parts Section pages for a complete diagram of the
tractor valve hookup.
SELECTOR VALVE INSTALLATION
NOTE: Refer to the parts section and illustration below for hardware and position.
The selector valve is attached to the boom rest. The 1/4” hoses from the swivel
section of the lift valve are plumbed to the “A” and “B” ports on the selector valve. A
run tee is added to the return section of the lift valve. Attach the 1/2” hose from the
“T” port of the selector valve to the run tee. 1/4” hoses are attached to the “A1”, ”A2”,
“B1” & “B2” ports on the selector valve to the knuckle cylinder and swivel cylider.
ACCUMULATOR INSTALLATION / PLUMBING
Install the accumulator bracket on top of the main frame mast with the capscrews
and lockwashers shown. Install the accumulator in the bracket and secure with the
hardware shown. Install the tee on the accumulator and the hose from the accumulator
to the gland on the main boom cylinder. Install hose from accumulator to the control
valve.