Operating instructions
149 443 83
C 4.74
Operating the implements
Bild_C268
1
2 3
4
5
Adjusting the upper link
The upper link can be secured at different holes. The re-
quired height depends on your implement (for a better adap-
tation of the equipment, to increase the lifting force and
depending on the lifting height).
Upper hole
• More lifting power, lower lifting height.
Lower hole
• Lower lifting power, higher lifting height.
ATTENTION
The equipment must not hit the cabin.
1 Retaining clip
2 Top link
3 Top link pin
4 Toggle
5 Locking lever
- Secure the top link (2) with the pin (3) and secure the
pin with the retaining clip (1).
- Adjust the top link (2) to the required length (by turning
the toggle (4) to screw it in or out); secure the top link
with the locking lever (5).
ATTENTION
Both threads must be screwed in equally far.