Operating instructions
149 443 161
C 4.74
Maintenance during the first period
of operation
The following checks and services are due during the first
period of operation:
Maintenance after the first 50 hours
Maintenance after the first 150 hours
Maintenance after the first 500 hours
Maintenance after the first 50 hours
Check the engine for leaks
- Raise the dump body (loading platform*) and secure it
against accidental lowering.
- Check the engine and implements for leaks.
Carry out the other services in accordance with the mainte-
nance schedule. You can find the description of the serv-
ices using the indications in the maintenance schedule or
in the alphabetical index.
* Option