Jacuzzi J - 345 Swimming Pool Vacuum User Manual


 
11
J-300
Proper Drainage: It is extremely important to have in place
measures to sufciently handle excessive water spillage. Be
sure the ooring in which the spa rests on has adequate drainage
and can handle the entire contents of the spa. Be sure to make
provisions for ceilings and other structures that may be below the
spas installation. Areas around your spa can become wet or moist so
all ooring and subsequent furniture, walls and adjacent structures
should be able to withstand or resist water and moisture.
Proper Ventilation: Proper ventilation should be discussed with
an Engineer or authority competent enough to understand the
necessary provisions needed to vent moist or heated air and air
associated with chemical odors outdoors. When the spa is in use
considerable amounts of moisture will escape, potentially causing
mold and mildew over time which can damage certain surfaces and/
or surroundings.
Sufcient Access: In the unlikely event that you should ever need
to access or gain entry to any portion of the spa for servicing, it is
highly recommended that you plan your indoor installation to provide
full access to the entire spa.
Warranty: Damage caused by not following these guidelines or any
improper installation not in accordance to local codes or authorities is
not covered under the spas warranty. Please consult your local state
or city building ordinances.
Do not shim the spa. To ensure proper support the spa must sit at
on the intended foundation.
5.0 General Electrical Safety Instructions
Your new Jacuzzi spa is equipped with a “state-of-the-art”
equipment system. It contains the most advanced safety
and self-protective equipment in the industry.
Nonetheless, this spa must be installed properly to insure
dependable usage. Please contact your dealer or local
building department should you have any questions regarding your
installation.
Proper grounding is extremely important. Jacuzzi spas are equipped with
a current collector system. A pressure wire connector is provided on the
surface of the control box, located outside the equipment door (Figure
B, page 17) to permit connection of a bonding wire between this point
and any ground metal equipment, metal water pipe or conduit within 5
feet (1.5m) of the spa, or copper clad grounding rod buried within 5 feet