22 Hydraulic Installation
MAN0041 (Rev. 4/4/2008)
1023584 HOSE KIT
General Description
These set-up instructions are for operating the LU126
or LU132 loader using the tractor hydraulics. To use
this connection, the tractor must be equipped with two
hydraulic levers and four tractor hydraulic couplers at
the rear of the tractor as shown in Figure 38.
NOTE: The male hydraulic quick couplers for connec-
tion to tractor are NOT INCLUDED with this hose kit
but are available as service parts.
NOTE: After the hydraulics and loader are installed
on the tractor, check the clearance between the top of
the exhaust pipe and the loader boom when the
loader is raised. If there is interference, a weather cap
will need to be installed. See Page 6 for installation
instructions.
Figure 38. Tractor Rear Hydraulic Couplers (Typical)
Assemble Hoses
1. Attach a 90-degree elbow (2) and male quick
coupler (3) to each loader supply hose (1). See
Figure 39.
2. Connect loader supply hoses to loader feedlines
as shown in Figure 40.
3. Route hoses along right mount, under the
cab/operator’s platform, and over right rear axle.
Be sure to avoid contact with 3-point linkage,
brake pedals, and other moveable tractor
components. Hoses must be routed so that they
are not pinched, bent sharply, or chafed during
operation.
1. 1023493 Hose, 200" x 3/4 JICM x 3/4 JICM
2. 313053 Elbow, 3/4 JICF x 1/2 NPTM 90°
3. -------- Quick coupler, male
(not included in kit)
Figure 39. Hose Assembly
Figure 40. Loader Feedline Connections
DP12