Jacuzzi BZ00000 Outdoor Shower User Manual


 
TOWERS AND DOORS INSTALLATION
10
Jacuzzi Whirlpool Bath
©
BZ00000 03/05
GROUT
STUD
SHIM IF NECESSARY
DO NOT FILL
CEMENT
BOARD
TILE
SILICONE
SEALANT
1-1/8" MAXIMUM
NO MINIMUM
SHOWER
BASE
CAULKING
TILE
CEMENT
BOARD
TILE
ADHESIVE
STUD
FLANGE
SHIM IF
NECESSARY
TO FILL GAPS
BETWEEN STUD
AND FLANGE
STUD
1/8" GAP
BETWEEN
BASE &
TILE
DO NOT FILL
THIS AREA
ATTACH WITH
SCREWS PROVIDED
STEP 6
Place cement board or equivalent on top of shower base flange and over side wall post flat then secure to studwall.
Apply tile (or other finishing material) leaving a 1/8" gap between the finishing material and the shower base flange
lip. Leave a 1/8" gap between the finishing material and the side wall post flange. Seal the gaps with silicone sealant.
Leave a minimum 1/4" gap at the back and front corners of the shower base to allow drainage from leakage through
unsealed tiled grout. See Shim Instructions on page 6.
STEP 7
Filling the area marked DO NOT FILL will prevent moisture from properly draining back into the base through weep
holes. This moisture is due to leakage through the tile grout. Sealing the tile grout will reduce or prevent this leakage.
STUD OR
BLOCKING
WATER TOWER
SIDE WALL POST
SIDE JAMB
CAULKING
TILE
CEMENT BOARD
TILE ADHESIVE
TILE
DO NOT FILL
THIS AREA
1/8" GAP
BETWEEN
BASE &
SIDE WALL POST
SIDE JAMB
STUD OR BLOCKING
TILE
CEMENT BOARD
TILE ADHESIVE
DO NOT FILL
THIS AREA
STEP 8
NOTE: ALLOW 24 HOURS DRYING TIME BEFORE CONTINUING THE TOWERS AND DOORS INSTALLATION.