Jacuzzi BZ00000 Outdoor Shower User Manual


 
TOWERS AND DOORS INSTALLATION
STEP 4
Place the center support rail into slot on each tower. If
rail does not readily fit into slots, it may be necessary to
loosen the bolts holding towers to base (it may only be
necessary to loosen one tower). DO NOT FORCE
CENTER RAIL INTO SLOTS. With center support rail
in position, install hold down brackets but do not tighten
screws. Do not mount side rail or short rail(s) at this
time. See HOLD DOWN BRACKET detail. Side rail and
short rail(s) must installed after all finish tiling, trim, and
sealing are completed.
9
Jacuzzi Whirlpool Bath
©
BZ00000 03/05
CENTER SUPPORT RAIL
HOLD DOWN BRACKETS (5)
RAIL BRACKET
SHORT RAIL (1 RAIL WITH 2 WALL)
WATER TOWER DOOR POST
(2 RAILS WITH 3 WALL)
(2 WALL ONLY)
SIDE RAIL
COVER CAP
(2 WALL ONLY)
(2 WALL ONLY)
WATER TOWER JAMB
(2 WALL ONLY)
RAIL HOLD
DOWN BRACKET
(1 PER AIR TOWER)
SCREW (8 PER WATER TOWER)
(4 PER AIR TOWER)
(2 PER WATER TOWER)
SIDE RAIL OR
SHORT RAIL
HOLD DOWN BRACKET DETAIL
STEP 5
Add blocking if the side wall post does not rest on a wall stud. Level side wall post and anchor side wall post to wall
stud or blocking using 3 screws provided. Do not screw tower jamb to side
wall post at this time.
BLOCKING
WATER TOWER
SIDE WALL POST
SCREW
SCREW
SIDE JAMB
SIDE WALL POST
SIDE JAMB
BLOCKING
SCREW
SCREW