Alamo T 7740 Lawn Mower User Manual


 
© 2005 Alamo Group Inc.
2-9
MACHETE
SERVICE BULLETIN No. 962703
Alamo Industrial Technical Services Department
1502 East Walnut
Seguin, Texas 78155
830-372-2708
Frame Rail Reinforcement, LH Frame Rail:
Subject:
Add Gusset to Left Frame rail of certain A-Booms and Machetes
Service Required:
1. Weld Gusset, P/N 02970138 to left frame rail as instructed on installation drawing which will be
sent with Gusset when ordered.
2. When welding some thing on a square tube do not weld across the square tube, that will weaken
the square tube. Always try to weld the length of the tube on the corners.
3. Paint Gusset and welded area.
Parts Required:
Part No. Qty Description
02970138 1 Gusset
------------- 1 Can Spay Paint, High Gloss Black (Obtain Locally)
Models: Machete Boom Mowers & A-Boom Mowers
Date:
Mar. 27, 1996
Bulletin No:
962703
(Old # 960003)
Parts:
100 % at Dealer Net
Labor:
1.0 hr. at Dealer registered
Shop Rate
Termination Date:
Oct. 1, 1996
Old Parts Disposition:
No Returnable Parts
involved
Warranty Compensation will be provided following proper filing of warranty claim in accordance with
the Alamo Industrial Warranty Policy. Claim allowance may vary in accordance with laws governing a
specific region. Any Warranty associated with this service bulletin must be within authorized dates.
Gusset 02970138
DO NOT Weld across square tubing when welding
Left Frame Rail
Rear
Front
Weld to outside
of Frame Rail
Figure 1