Alamo SR20 Brush Cutter User Manual


 
MAINTENANCE
MAINTENANCE
SR20M/SR14M 11/01 Maintenance Section 5-5
© 2004 Alamo Group Inc.
MAIN CV DRIVELINE SAFETY SHIELD
1. To remove the outer CV cone, remove the locking screws from shield cone. Remove cone over yoke. FIGURE
7. Remove bearing ring and remove the locking screws from inner shield cone. Figure 8. Turn inner cone to
assembly position and remove half shield. Remove bearing ring. FIGURE 9.
FIGURE 10
FIGURE 7
FIGURE 8
FIGURE 9
FIGURE 11
FIGURE 12
1. To assemble outer CV driveline, grease yoke groove and inner profile tube. Attach bearing ring on groove with
recesses facing profile tube. FIGURE 10. Slide on half shield with cone. Turn cone until it engages correctly.
FIGURE 11. Tighten locking screws. Grease bearing groove in double yoke. FIGURE 12. Insert bearing ring.
Slide guard cone for double yoke over cam from the connecting end. Make sure holes for screws are visible.
FIGURE 13. Tighten locking screws. FIGURE 14.
FIGURE 13
FIGURE 14