AEG 2.33 2 Portable Generator User Manual


 
54
• “JUL“: The annual battery test will run in July.
• “AUG“: The annual battery test will run in August.
• “SEP“: The annual battery test will run in September.
• “OCT“: The annual battery test will run in October.
• “NOV“: The annual battery test will run in November.
• “DEC“: The annual battery test will run in December.
Screen 3.4. “Advanced Setting”
In this section basic setting can be changed on the UPS. There is the risk that
changes made can affect the function or cause damage to the UPS. Changes
contained within this section should only be made by authorized personnel.