AEG 2.33 2 Portable Generator User Manual


 
46
6.3.2. UPS STATUS CONTROL (SCREEN MENU 1.0)
Screens 1.1 and screen 1.2:
Starting and switching off the equipment.
For how to start and switch off see chapter 5.1 and 5.2.
Screen 1.3:
Ordering a battery test. In the second row, information about the battery test is given.
Possible messages:
• “NOT AVAILABLE“: The battery test is not available.
• “PRESS <ENTER>“: Press <ENTER> to run the battery test.
• “EXECUTING“: The battery test is running.
• “SUCCESSFUL“: The battery test has been successful.
• “NOT SUCCESSFUL”: The battery test has not been successful.
Fig.29:  Screen 1.0 Control & status screen
Fig.30: 
Confirm YES
DO Battery Test
Confirm YES
Turn OFF UPS
Confirm YES
Turn ON UPS
()()
(
) ()
()()
(
) ()
Back
Battery Test
ON
OFF
Control
Main
screen 0.0
screen 1.0
(Ent)
(Ent)
screen 1.1
(Ent)
screen 1.2
(Ent)
screen 1.3
(Ent)
screen 1.0
”Control & status” level