Snapper 2137 Lawn Mower User Manual


 
13
Initial Assembly & Installation
Figure 15. Attach Dozer
A. Dozer Pins C. Attachment Hooks
B. 5/8 x 1-5/8” Flat Head Clevis Pin
A
B
C
Install Dozer Blade
1. Fully lower the attachment lift.
2. See Figure 15. Attach the dozer to the tractor by
resting the dozer pins (A) on the front attachment
hooks (C).
3. See Figure 15. Install two clevis pins (B) on both
sides and secure with safety clips.
Figure 16. Lift Rod
A. 1/2 x 1-1/2” Round Head F. Lift Rod
Clevis Pin G. Front Hitch Bracket
B. Dozer Lift Arm H. Lift Extension
C. Safety Clip I. 5/8 x 1-5/8” Flat Head
D. Ladder Hitch Clevis Pin
E. Hitch Lift Arm J. 1/2 x 2” Flat Head
Clevis Pin
I
C
D
E
F
G
H
B
J
A
C
4. See Figure 16. Attach the dozer lift arm (B) to the
hitch lift arm (E) using a clevis pin and safety clip.
NOTE: At this point during initial installation tighten the
capscrews (C, Figure 10) securing the rear hitch mount-
ing brackets. This is only necessary when installing the
attachment for the first time.