Subaru Robin Power Products EH12-2, EH17-2, EH25-2 Portable Generator User Manual


 
1
Tightening
torque
I
I
59-63
N-m
I
600-650
kgocm
I
43-47
ft*lb
I
54-13
IGNITION
COIL
Install the ignition coil
to
the crankcase.
Adjust the air
gap
between the ignition
coil
and the
flywheel using a thickness gauge (filler gauge) and
tighten the bolts.
Tightening torque
8.8-10.8
Nom
I
90-1
10
kgecrn
6.5-8.0
ft4b
A
Fig.
5-40
5-4-14
INTAKE PIPE,
lNSULATOR
(1)
Install the intake pipe to the cylinder head with gasket.
EH12-2,
17-2
M6 flange nut
..---.....-.......-.
2 pcs.
M6
X
25mm flange bolt
.-.......
1
PC.
EH25-2 M8
X
28mm bolt and washer
3
pcs.
Tightening torque
9.8-1
3.7
Nm
7.2-10.1
ft4b
100-1
40
kgocm
Then put the gasket and the insulator on the intake pipe.
54-15
CARBURETOR
Install the gasket and the carburetor to the intake pipe.
54-16
GOVERNOR
SYSTEM
(1)
Connect the governor lever and the throttle lever
on carburetor with governor rod and rod spring.
Install the governor lever
on
the governor shaft.
(2)
Install the speed control lever to the cylinder
head.
GOVERNOR
LEVER
Fig.
5-4
1
-
40
-