Husqvarna R120S Lawn Mower User Manual


 
4 –
English
Service journal
Pre-delivery service
1 Charge the battery for 4 hours at max. 3 amp.
2 Fit steering wheel, seat and any optional equipment.
3 Check and adjust tyre pressure. (60 kPa, 0.6 bar, 9 psi).
4 Check that the right amount of oil is in the engine.
5 Connect battery.
6 Fill with fuel and start engine.
7 Check that machine does not move in neutral.
8 Check:
Forward drive.
Reverse drive.
Operation of blades.
Seat safety switch.
Lif lever safety switch.
Safety switch for parking brake.
Check engine speed. See the Technical data section.
9 Tell customer about:
Needs and benefits of following the service schedule.
Servicing and the influence of this journal on the second-hand value of the machine.
Range of applications for BioClip.
Complete proof of sale etc.
Pre-delivery service carried out. No outstanding problems. Certified:
_______________________________________________________________________________
Date, mileage, stamp, signature
After the first 8 hours
1 Change engine oil